Task(s): Visual and measurement technology development for check work when retrieving fuel debris.
(1) Prior preparation - Major challenges on the actual method
Check before operation.
How to confirm the following
- Location, shape and condition of internal structures
- Location, shape and condition of fuel debris
- Condition of hydrogen accumulation
- Condition of radiation dose rate
- Condition of dust
⇒Visual and measurement technology
Assumptions and prerequisites |
- Air dose rate inside the PCV/RPV
- Dose rate inside the PCV 100Gy/h
- Dose rate inside the RPV 1kGy/h
- PCV exterior effective dose rate
- Operation floor : 1mSv/h
- Operation areas other than operation floor : 3mSv/h
- Passageway inside the building : 5mSv/h
- Give consideration to the possibility of the accumulation of hydrogen gas inside PCV/RPV when cutting fuel debris or internal structures.
|