Task(s): Method for dismantling of internal equipment, transport and storage after dismantling.
(5) Dismantle and remove internal structures - Major challenges on the actual method
Removal
- Method for cutting/dismantling/removing the internal structures
- Equipment to be used for the method
(Out of scope of the cutting and dust collection technology written in the RFP)
Assumptions and prerequisites |
- PCV/RPV interior air dose rate
- PCV interior dose rate 100Gy/h
- RPV interior dose rate 1kGy/h
|
Temporary storage
- Preparation of temporary storage
- Method for transportation of the internal structures to the temporary storage
Assumptions and prerequisites |
- Allowable load of 1st. floor : 1.2t/㎡
- Size of equipment which should be transported through passageway : Width 1.2m, Height 3m or less
|