Task(s): Installation of equipment, transporting control and management of ventilation inside the boundary.
(5) Install equipment and access - Major challenges on the actual method
Installation of equipment
- Installation and stabilization of the cutting, transporting equipment required for post-process
- Dismantling and removal of internal structures
- Retrieving fuel debris
- Storage of fuel debris and transfer of canisters
- Remote detachment
- Maintenance of equipment and actions to trouble
Assumptions and prerequisites |
- Allowable load of operation floor and passageway : 1.2t/㎡
- Size of equipment which should be transported through passageway : Width 1.2m, Height 3m or less
- Overhead crane specification (Rated load 100t)
- Air dose rate inside the PCV/RPV
- Dose rate inside the PCV 100Gy/h
- Dose rate inside the RPV 1kGy/h
- Effective dose rate outside the PCV
- Operation floor : 1mSv/h
- Operation areas except for operation floor : 3mSv/h
- Passageway inside the building : 5mSv/h
- Total weight of equipment installed on the operation floor shall be minimized in consideration of seismic safety.
|
Control of Transportation
- Operation range of works that workers conduct directly or remotely
- Method for operating, monitoring and controlling the transport of equipment
Assumptions and prerequisites |
- Allowable load of operation floor and passageway : 1.2t/㎡
- Size of equipment which should be transported through passageway : Width 1.2m, Height 3m or less
- Overhead crane specification (Rated load 100t)
- PCV/RPV interior air dose rate
- PCV interior dose rate 100Gy/h
- RPV interior dose rate 1kGy/h
- Effective dose rate outside the PCV
- Operation floor : 1mSv/h
- Operation areas except for operation floor : 3mSv/h
- Passageway inside the building : 5mSv/h
- Total weight of equipment installed on the operation floor shall be minimized in consideration of seismic safety.
|
Set-up of Ventilation
- Design of required air quantity and specification of ventilation facilities
- Installation of ventilation/exhaust equipment
- Prevention of radiological release into external environment
- Exchanging air ventilation filter