Task(s): Method for remove and transfer of equipment for dismantling and transporting.
(9) Clean-up equipment - Major challenges on the actual method
Clean-up equipment method
- Method of dismantling and removing cutting and transferring equipment
- Maintaining boundary after clean-up equipment
Assumptions and prerequisites |
- Allowable load of operation floor and passageway : 1.2t/㎡
- Size of equipment which should be transported through passageway : Width 1.2m, Height 3m or less
- Overhead crane specification (Rated load 100t)
|